4.2 Rinse time
The optimum principle is to completely rinse cream in the placement area,
tiny expose raw sand and wash cleanly in 32h~36h after pouring. The standard
rinsed on transverse joint is in cream rinsed completely, micro exposition of coarse
sand and cleanliness generally 10d after cast. The optimum rinse time of P.MH
concrete is 16~20h after pouring, the optimum rinse time of P.LH concrete is
14~16h delay while compared with P.MH concrete.
4.3 Time of forms removal
Time of forms removal have been test at 26h, 30h, 38h, 42h and 48h after
concrete cast, it is ascertain that the time of forms removal is 42h~48h to guarantee
smooth appearance. The time of forms removal for P.MH concrete is 24h after cast,
the time of forms removal for P.LH concrete is 18h~48h delay while compared with
P.MH concrete.
4.4 Construction time-schedule
Although the rinse time and forms removal are a bit lag 2d after poured, there
is no influence to the construction time-schedule even if 1d~2d delay as 7d~10d is
required for the next concrete placement preparation which is in the construction
time interval. As the rinse to the transverse joint is later, it is witnessed the
application of P.LH concrete makes no influence to the construction time-schedule
in comparison with the application of P.MH concrete.
1686
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik