4.2. COLUMNAR ENCASEMENT WALL
In the shallow section at the left rim, about 36 m long, the encasement wall
was specified and designed as a columnar wall consisting of 2.3 m diameter and
up to 11 m deep unreinforced concrete columns. The columns were excavated
under dry conditions using fully cased Kelly drilling by a BAUER BG 50, the most
powerful rotary drilling rig made by BAUER at the time, capable of delivering a
maximum torque of 468 kNm.
4.3. MONO BLOCKS
In order to tie-into the existing concrete dam monolith at the upstream face,
the barrier wall runs parallel to the existing dam for approximately 14 m, which
resulted in a section of the encasement wall in close proximity to the sloped
upstream side of the concrete dam. This creates a wedge of embankment soil
between the barrier wall and the existing dam. BFC decided to fully replace this
wedge of soil with a special encasement wall. This was achieved by a series of
seven, 2 m wide, 5.5 to 8.2 m long and up to about 60 m deep multi-bite panels
called mono blocks, which touch each other along the long side (Fig. 4).
Fig. 4 Layout of Mono blocks
1696
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik