Data from verification boring indicate homogeneous concrete from top
to bottom, and a clean concrete-to-rock contact.
Only the tie-in element TY1487 was constructed differently.
The tie-in element TY1487 perpendicular to the concrete dam (Fig. 6) was
installed as a primary element with a trench cutter using several bites. The first
bite was furthest away from the concrete monolith and was cut to the foundation
level of the concrete dam. The cutter was controlled lowered to defined depths
cutting into the concrete of the monolith. Guidance was assured by the standard
cutter guide frame at the top. After cutting the other bites from top to down into
the monolith, finally at the position of the first bite, the cutter was lowered and
excavated to the specified final depth. Due to this sequencing, the cleaning of the
bottom of the element TY1487 was assured.
SUMMARY
The risks associated with failure of Center Hill Dam were significant and
urgent which prompted the USACE to address this risk producing a remediation
program of unprecedented scope with stringent specification requirements.
Execution of the remediation provided many lessons learned for the USACE and
BFC and the project achieved great technical success.
In spite of strict specification requirements, BFC met or exceeded the
required plans and specifications with a value engineering approach that also
resulted in significant cost savings to the government. BFC was able to achieve
this using innovative techniques and equipment for diaphragm wall construction
that allows for extremely accurate excavations in very challenging geologic
conditions.
It was observed that for the steered hydrocutter excavation the maximum
deviations out of plumb – like the maximum panel rotations – typically occur well
above final excavation depth since corrections are made during drilling or
excavation. The maximum deviation is not a function of depth but the system-
inherent result of survey accuracy and steering capabilities. For this reason, the
verticality tolerance for deep cut-off walls installed with steerable techniques
should be specified as an absolute value similar to rotation and not as a
percentage of depth.
The challenging tie-in connection to monolith 29 of the existent concrete
dam executed successfully proved, that such connections are feasible.
Connecting perpendicular was required due the highway running across the dam.
Contractor detailed designed and execution achieved the specified task.
1700
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik