structures. The piezometric records, complemented by tracer tests, guided the works on the
grout curtain and also alerted on piezometric hazards rising at the spillway, the powerhouse
and in the deep, confined aquifer.
As verified by hydrogeological model simulation, deepening the grout curtain within
technical viability promised to reduce reservoir seepage by up to 30%. This effect was not
justifiable from an economical point of view. Considering the uncertainty regarding the
recharge to the deep aquifer, constraining the seepage at higher levels in the foundation could
even risk producing higher loads on the deep aquifer. These considerations led to the decision
to implement additional drainage works in both valley flanks and to adopt an observational
approach for the deep aquifer. Figure 6 shows the alignments of the drainage galleries, which
were constructed in the valley flanks.
After 12 years of safety monitoring, hydrogeological investigations and complementary
works on the curtain, the drainage system and the instrumentation, a set of criteria for future
action was defined [5], distinguishing three levels of increasing hazard. Level 3, the worst-case
scenario, would prompt declaration of an Alarm and immediate start of contingency action
under the following conditions:
If the drainage gallery discharge increases by 20% or if the trend is of the order of 10%
per month
For the curtain and deep aquifer piezometers 20% abrupt change, or 10% persistent
monthly trend for an Alarm. For the deep aquifer, these criteria would also apply for a
loss of piezometric head because such drop would indicate serious hydrofracturing or
erosion of the confining layer.
An Alarm should be declared if the seepage water in the observation pits, the dam site
springs or drainage galleries becomes turbid, indicating erosion of the foundation or the
core.
An Alarm should be given if a sinkhole develops in the vicinity of the dam or the structures
An Alarm must be declared if the admissible uplift at the powerhouse or the spillway
chute is reached or exceeded.
With the data provided by the monitoring system, timely remedial action can be taken and the
hazards linked to the karst can confidently be contained.
ACKNOWLEDGEMENTS
Out of the large number of professionals participating in the implementation of the monumental
project, a few are mentioned because of their specific support to the installation of the
monitoring system and contribution to the geological and hydrogeological investigations: E.
Basmaci, A. Öktem, E. Önhon, J. D. Andrey. Credit also has to go to the auxiliary staff who
over the years conscientiously collected the wealth of monitoring data.
REFERENCES
[1] Basmaci, E., 1991: Foundation behaviour of Ataturk dam on first filling. Proc. 17th Congr.
ICOLD, Q. 66, R. 57, pp. 1051-1062
[2] Riemer, W., Gavard, M., Soubrier, G., Turfan, M.: The seepage at the Atatürk fill dam.
Proc. 19th Congr. ICOLD, 1997, pp 613-633
1747
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik