Water tightening of reservoir bed and upstream
face of dam in Persian Gulf Martyrs (Chitgar)
Lake - A Case Study
Introduction
Chitgar (Persian Gulf Martyrs) Artificial Lake of Tehran was recently developed for recreational purposes and
has significantly changed the landscape of the Iran’s Capital. Design and Construction of the lake involved
many technical challenges. Shortage of water supply from the nearby river, a four-month impounding constraint
and significant surficial evaporation made water tightening at the reservoir bed and the surface of the upstream
earth fill dam inevitable. Several solutions were initially considered for the purpose of water tightening among
which use of clay blanket, concrete protection layer, injection in alluvium, protective hydraulic asphalt and
finally Geomembrane were notable. After carrying out comprehensive technical and economic studies and also
considering the time frame of construction, use of Geo-synthetic material was ultimately selected as the best
option. In this paper, challenges and lessons learned during construction and installation of Geomembrane for
the 130 hectare Chitgar Lake were discussed. Authors hope that information provided herein can be used and
applied to many similar projects and help toward improving technical knowledge and successful completion of
large scale water tightening projects around the world.
1. Chitgar Lake and City of Tehran
Chitgar Lake was developed with the objectives of improving on recreational, commercial,
environmental attractions of the Tehran City. The Lake is located in West side of Tehran near the
Chitgar National Park and also in vicinity of the Alborz Mountain Range. These nearby natural
features have dramatically improved the scenic beauty and landscape of the area.
Figure 1 Areal View of Chitgar Lake located West of Tehran City
In General, the Lake Project consists of three main components which are illustrated in Figure 2.
A: Diversion Dam
B: Water Conveyance from Kan River to the Lake
C: Rock-fill/Earth-fill Dyke/Dam and Reservoir M. Zolfagharian
Project Manager of Construction of Persian
Gulf Martyrs (Chitgar) Lake, Tehran
Municipality
Tehran
Iran
Ali Emam
Managing Director of Engineering and
Development Organization of the city of Tehran
(EDOCT)
Tehran
Iran
Rouzbeh Radman
Armature Pardis Co., Engineer
Tehran
Iran
Nima Rashidi
Armature Pardis Co., Project Manager
Tehran
Iran
1750
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik