3.3. Water tightening using Injection in Alluvium Layer
In principle, injection in alluvium is very rarely used where no other option is available. This method
requires heavy research before implementation and is often very costly and time consuming. In
addition, injection in fine-grain material would result in rupture and fracture of soil due to hydraulic
pressure of injection which is highly undesirable.
For Chitgar Lake, considering the type of soil material, permeability and fine material amount, use
of high Belin cement grout injection to achieve allowable permeability (even with injection holes
distanced at 75cm) was not feasible. Furthermore, injection using chemicals like Resin and
Polyurethane and other stable and unstable materials considering their permeability, even by using
50cm apart injection holes deemed not suitable to achieve the target permeability. Even if this
method was somehow technically feasible, due to the large size of the Lake, the projected cost and
implementation time makes it impractical within the given time-frame of the project as it required
nearly 2.5 million injection holes over the entire Lake area.
3.4. Water tightening using Asphalt Concrete
Another suggested method for water tightening of the Lake was use of Asphalt Concrete with the
details shown in Figure 4. In this method, after soil improvements and implementation of the base
layer, asphalt concrete with a total thickness of 10cm placed in two 5cm layers is used. Gravel size
for this type of concrete is not to exceed 12.6mm according to the ICOLD's Bulletin 114. About 7
to 8 percent bitumen may be used with a porosity of less than 4% to result in a permeability factor
of 1×10-8 to 1×10-9 cm/s. The bitumen has a penetration rate of 80-100 based on ASTM D5-D946
for asphalt concrete. As top finish, a 10mm thick layer of bitumen mastic layer will be placed on top
of the asphalt concrete to improve water tightening and provide physical protection.
Figure 4. Section Details for Asphalt Concrete Option
With assumption of average reservoir head of 7m and permeability of about 1×10-8 cm/s for asphalt
concrete, the annual seepage from the reservoir was estimated 300,000 m3 for an intact concrete
layer. By considering the possibility of cracking in the asphalt layer the estimated annual loss will
be doubled to a total of 600,000 m3/year.
3.5. Water tightening using Geomembrane
Use of Geomembrane was another alternative for water tightening of the Chitgar Lake. The
Geomembrane consists of three layers of Geo synthetic material: a Geomembrane layer protected
by two layers of Geo textile on top and bottom. Use of Geomembrane has many advantages as
follows:
very low permeability rate to reduce the reservoir seepage
sufficient flexibility to allow placement on alluvium with minimum base preparation
a continuous impervious layer extending from the lake to the upstream surface of the
earth-fill dam
ease and high pace of installation process
The main weakness of Geomembrane is its vulnerability to possible physical damage which can be
mitigated by soil placement on top of the Geomembrane; however this remedy makes it very difficult
to locate and fix the possible damaged area during operation and maintenance.
In this method after soil improvement is complete, the bottom Geotextile layer is placed at the
reservoir bed. Then the main Water tightening Geomembrane layer is placed on top of Geotextile
1753
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik