significant interruption on construction of upper levels, geocomposite layer is
installed and precast concrete panels are thereafter placed on it. It is noteworthy
that concrete-panel cover layer’s stability and harness system were analyzed.
Being in critical path, geocomposite in elevation of +45 to +50 was
implemented first. Lower part can independently be installed; but the upper part
should be installed after completion of CPCG in middle part.
4.3. ELEVATION +53 TO +60
Winchester method is used in this part; i.e. precast concrete panels
overlaid with geocomposite layer are used as formwork. In this method precast
concrete panels stability has been considered as well.
Fig. 4
Berms of Elev.+42 & +50, Dam U/S View
Similar combinational method including Winchester method in upper part
and exposed method in lower part (backfilled later on) has been utilized in
Rizzanese RCC dam in France [3], [4].
1792
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik