Fig. 3 Fig. 4
Appearance of Seepage Measuring
Room Inside Seepage Measuring Room
3. FIELD INVESTIGATION
3.1. OVERVIEW
Naked eye investigation, test pit investigation, concrete strength
measurement, boring investigation, and Lugeon test were performed to
determine the cause of failure of the seepage measurement facility.
3.2. NAKED EYE INVESTIGATION
The concrete of the water-collecting wall has been deteriorated and
damages such as local breakage and peeling were found. However, the overall
condition was acceptable and did not appear to have functional problems.
The seepage measurement facility using V-notch was constructed by using
concrete and stainless steel, and the conditions of all four screen facilities
installed inside were acceptable, and it is deemed that the facility has not lost its
functionality completely as it maintained consistent water level even after
pumping for a long time in the upstream area of the water-collecting wall.
3.3. TEST PIT INVESTIGATION
The test pit investigation was carried out at two points at the corners of both
banks where it was expected that the influence of the groundwater level on the
excavation would be low and the construction of the water wall would be easy to
1801
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik