Fig. 3 Geologic Map of Mae Thi Dam Site (DMR, 2007)
3. METHODOLOGY
The main objective of this work was to improve ground condition of dam by
carrying out cement and chemical grouting without excavation and emptying reservoir.
The profile of grouting works conducted is shown Fig. 4 [3]. Other geotechnical works
like the Standard Penetration Test (SPT), permeability tests of the soil, Lugeon Test in
rock, drilling holes for cement and chemical grouting were carried out appropriately.
Finally, after completion of work requirement quality and limit check was carried
regarding the permeability, SPT and Rock Quality Designation (RQD).
3.1 CEMENT GROUTING
For rock foundation, high pressures cement grouting process with quick setting
condition was applied. Whereas, for areas with high uplift pressure cement grouting was
carried out in discrete steps allowing setting time for grout. Portland Cement Type 1 or
Type 3 was used for cement grouting. The compound was used to improve the foundation
in stages with varying ratio of cement and water of 1:10, 1:8, 1:6, 1:4, 1:3 and 1:2.
Mortar was applied using varying pressure with depth with details given in Fig.5 At first
hole was drilled to specified depth then permeability test using water pressure was carried
out. Depending upon the permeability the grout mixture was selected as shown below.
1823
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik