Project Lay-out
The Isimba HPP structures are arranged in a polyline perpendicular to the flow of
the river. The structures arranged along the dam axis, from left to right are the Left
Embankment Dam section to connect the whole complex to the left bank, the
Concrete Gravity Dam section GD1, Powerhouse, Spillways SP1 and SP2, the
Concrete Gravity Dam section GD2 and the Right Embankment Dam section to
connect the whole dam complex to the right bank . For the connection between the
concrete structures and abutments as well as for the closures of the right river
channel an earth-rock-fill dam type with central clay core was selected.2 The lay-
out of the embankment dams for Isimba HPP is shown in Figure 1 below.
Fig 1: Artistic Impression of Isimba Hydro Power Project (Adopted from EPC
Contractor’s Implementation Proposal, 2014)
2 Isimba HPP Feasibility Study Report - Fitchner and Norplan , September 2012
1833
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik