up into smaller pieces. The broken pieces are removed by clamshell bucket. Clam-
shells can also be used to excavate for the cut off wall trenches in soft rocks or
foundations with gravely soils. When all the loose and broken up rocks are
removed, concrete for the cut off wall is cast. For Isimba HPP, the cut off wall was
excavated by use of a percussion hammer. During this excavation and chiseling of
the rock and boulders, a lot of rock fragments were generated and these
accumulated at the bottom of the slurry trench. To remove these rock fragments,
airlift equipment was specified as part of the excavation method statement.
However, the EPC Contractor used a bailer to remove the rock cuttings, excavation
debris and contaminated slurry but it wasn’t not suitable to do full cleaning of the
bottom of the cut-off trench. As such, a lot of loose rock fragments would stay at
the contact between the cut-off wall concrete and the engineering rock. The
concrete wall was constructed by tremie pipe placement of concrete. The tremie
concrete placement method uses a vertical or near vertical pipe, through which
concrete is placed by gravity feed into the bentonite or clay-slurry-filled trench. The
lower end of the pipe is kept immersed in the clay slurry/ bentonite slurry so that
concrete rising from the bottom displaces the bentonite or clay slurry, thus limiting
washing out of the cement content of the fresh concrete to the exposed upper
surface. The upper end of the tremie pipe is kept above the trench level during the
pour and is provided with a conical hopper for batch loading, or concrete may be
pumped into the top of the tremie pipe. Concrete must be poured at a rate which
avoids setting in the tremie. Admixtures may be used to control setting time, slump
and workability. For the Left Embankment Dam at Isimba Hydro Power Project,
admixtures like fly ash were added to improve the workability of the concrete and
also minimize the heat generation in the concrete. Since the concrete is poured
into the trench through tremie pipes and displaces the bentonite or clay slurry from
the bottom of the excavation upward, the concrete must have a consistency such
that it will flow under gravity and resist mixing with the bentonite or clay slurry. The
steel tubing is inserted (and later removed) as a part of a construction joint to
facilitate bonding of the concrete panels.
1840
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik