Seite - 1870 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1870 -
Text der Seite - 1870 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
SEALING OF AND FOUNDATION ON A 70 M ALLUVIUM LAYER OF ARKUN
DAM
Ronald HASELSTEINER
Department Manager Hydraulic Engineering, BJOERNSEN CONSULTING
ENGINEERS
GERMANY
Resul PAMUK
Monitoring Process Leader, ENERJISA ÜRETIM AS
TURKEY
1. INTRODUCTION
The Arkun Dam and HEPP project is located on the Coruh River in the North
East of Turkey. The main purpose is hydroelectric energy generation. Therefore, a
main and an environmental powerplant were installed showing a capacity of total
237 MW. The Arkun project is owned by EnerjiSA which was formerly a joint
venture of Verbund (Austria) and the Sabanci Group (Turkey) unless E.ON
(Germany) took over the shares of Verbund in 2013.
The project was completed and started operation in 2014 after only
approximately 5 years of construction. The project construction schedule and the
project budget were kept in the range of early project assumptions. The good
foundation and suitable dam fill material close to the dam location contributed to
the positive project progress and completion.
1870
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik