project milestones such as end of construction and first impoundment Fehler!
Verweisquelle konnte nicht gefunden werden..
Particular focus was laid upon the stress-strain behaviour of the cut-off wall
in order to assess the cracking potential induced by excessive tensile stresses.
The testing results of local laboratories confirmed the design assumptions that
intended to create an earth concrete mix with relatively low compressive strength
and low stiffness in order to achieve similar deformation behaviour, as the
surrounding alluvial material should show. Results of laboratories abroad and of
local universities indicated a much stiffer and more brittle material behaviour.
Relying on these later results serious cracking could not be excluded anymore,
which initiated the Owner to check the impact of this potential cracking of the cut-
off by a seepage analysis.
For the determination of the time dependent development of the cut-off wall
concrete samples were taken from the ongoing concreting works and were tested
after seven and 28 days and further selected periods. Two institutes came to the
result that the elasticity modulus reached values exceeding 1,000 MPa after 28
days. One institute persisted to obtain values of approximately maximum 500 MPa
also after 70 days after concreting. These contradictious results uncomforted the
responsible parties so that further testing and analyses were performed.
Field investigations and the stress strain modelling were the basis for
defining the future foundation level in form of the required excavation depth. The
field testing results were also contradictious since geophysical investigations
indicated a very loose degree of compaction of the alluvium to very large depths
which would require extensive excavation works. Finally, an excavation of
approximately five to ten meters underneath the dam footprint was realized in order
to eliminate the layers showing a high deformation potential and organic particles.
3. APPLIED MODELS, PARAMETER AND ANALYSES
3.1. GENERAL
For the Arkun CFSGD a 2D stress-deformation were prepared using the
Geoslope Sigma software package. For the seepage analysis the groundwater
module of the Rocscience Slide program was used. The seepage model was
further utilized in order to check seepage conditions for extreme load cases
neglecting the sealing effect of the upstream barrier consisting of concrete face,
articulated plinth and cut-off wall.
A limit equilibrium analysis was performed considering the shear stress
behaviour derived from large scale triaxial testing performed in the Karlsruhe
Institute of Technology (KIT) in Germany in order to optimize the downstream slope
1873
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik