c. A decrease in function of one or several efforts of seepage control in line
with the age of the dam.
Principally, the efforts of seepage control on the dam foundation are divided
into two categories, they are: by restraining the seepage (water barrier) and by
controlling the drainage. The design of dam used a combination of the two efforts.
The seepage control system on the dam body consists of divisions of embankment
zone, blanket drain, and toe drain.
Meanwhile, on the foundation, water barrier, downstream drainage ditch, and
relief well are made. Water barrier on the foundation can use a curtain grouting or
use a slurry cutoff wall or diaphragm wall.
2. CUT OFF WALL OR DIAPHRAGM WALL
In the area of Tugu Dam, the condition of foundation along the axis is greatly
various. The thicknesses of the alluvial deposit and weathering are greatly various
starting from 5 meters up to 28 meters. If an excavation of cut off trench is
conducted until it reaches the bedrock, this method is not economical. The repair
of foundation on the alluvial deposit and the strongly weathered rock using the
curtain grouting is also considered as ineffective.
This condition also considered the time function of construction and in line
with the age of the dam, with the water head of 80 meters, the water pressure on
the foundation will be very high. The effectiveness of material grouting for long term
period will not be able to ensure the permeability level is maintained. Considering
that the alluvial deposit and the strongly weathered rock are still porous enough, a
special repair of foundation is needed using the cut off wall or the diaphragm wall.
The slurry cut off wall is a kind of cut off trench which is very effective in
blocking the seepage from passing through the foundation of the dam. It is used if
the repair using the methods of either the curtain grouting or the cut off trench
which reaches the foundation layer of rock are not economical. The slurry cut off
wall is made by digging a vertical narrow trench as wide as 0.8 – 1.6 meter, through
the permeable foundation materials (alluvial layer, colluvium layer, or strongly
weathered rock layer). The excavation of the hole of slurry cut off trench is
conducted until reaching the layer of the bedrock which is relatively impermeable.
Then, the trench is filled with the suspense of bentonite slurry in the water during
the process of excavation. If necessary, slurry is continuously added during the
excavation in order to maintain the slurry stage to keep constant in the
surroundings of the top of hole/trench. It is necessary to prevent the collapse of the
hole/the slurry trench.
The foundation treatment using the cut off wall aims to reduce the
permeability of passing through the layer of porous deposit and to increase the
length of equipotential line of the seepage from the reservoir. In the earthfilldam
type, the cut off walls which can be used are:
1884
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik