4.2. TRIAL 2
A cut off wall with a width of 2 x 80 cm or two rows of upstream and
downstream bore piles are filled with the selected trial mix. Then, the permeability
test (check hole) is conducted with the above similar pressure.
5. CURTAIN GROUTING UNDER THE CUT OFF WALL
The height of the dam is around 80 meter from the excavation base,
meanwhile, the height of the cut off wall is only a maximum of 30 meter.
Therefore, an analysis of seepage under the foundation of the dam is
necessary to be conducted again. If the result of the analysis shows that
the seepage on the foundation under the cut off wall still occurs, the
implementation of curtain grouting work is necessary to be considered. Its
implementation is by using the rotary machine of ϴ 76 mm in the middle part
of the row of the cut off wall, by conducting a non coing drilling until
penetrating the bedrock. After that, grouting cement is conducted in the
part of the rock foundation, whereas, the hole on the cut off wall is plugged
soon using the material of cement.
Figure 3. Curtain Grouting under the cut off wall
1888
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik