6. THE RELATION BETWEEN THE CUT OFF WALL AND THE CORE ZONE
For the cement-bentonite slurry cut off wall, a special attention must be paid
on the connection between the cut off wall and the core in order that they are
really joint. Although the decrease in the cement-bentonite is not too much after
being hardened, but the compressibility will be different from the surrounding
foundation materials. Therefore, an effort to prevent the occurrence of high-
pressure concentration or low-pressure concentration is necessary. It is
suggested to install a concrete slab above the rows of plastic concrete as wide as
the area of the core zone foundation.
7. THE INSTALLATION OF INSTRUMENTS
The equipment of instrumentation is necessary for monitoring the condition
of the foundation permeability. The suggested equipment are as follows:
a. Inclinometer and settlement gauge to monitor the deformation.
b. Piezometer which is set beside the upstream and the downstream of the
cut off wall in order to monitor the efficiency of the cut off wall.
8. THE IMPLEMENTATION OF THE CONSTRUCTION
In the implementation of slurry trenching, commonly, a construction of berm
is necessary to be established, as the work surface level as well as for increasing
the stability of the work area slope. The placement of berm in a certain elevation
is by considering the difference of gap height and utilized as the work berm or the
foothold in the implementation of bore pile and casting works.
The cement-bentonite slurry will be hardened in several hours. A retarder
can be used to retard the hardening as well as to increase the workability of the
slurry. Before giving an agreement on the use of a kind of retarder, a designer
should examine first the possibility of the presence of adverse effects on the long-
term performance of the wall.
This such type of cut off wall has a round form and is deep, therefore, a tight
controlling is necessary on the verticality, besides, the deviation in horizontal
direction should be given a maximum limit on the percentage amount from the
depth.
The volume of cement-bentonite slurry will be decreased during the early
set up due to the loss of water and dewatering. Therefore, it is necessary to
implement an extra casting height for the reserve of the volume loss. The top
1889
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik