part of the cut off wall should be cut before implementing the concrete capping
work or foundation concrete slab.
The excavation of cut off wall using the method of bore pile (hydraulic rotary
drill) can be conducted continuously, by conducting a drilling in rotation with the
primary hole series (odd-number bore pile) and then the holes are filled with
cement-bentonite slurry and continued with the secondary hole bore pile (even-
number bore pile).
REFERENCES
[1] METTANA. Proposal of Foundation Treatment With Cut Off Wall in Tugu Dam,
Indonesia 2016.
[2] DIRECTORATE OF RIVER LAKE AND RESERVOIR. Guideline For Cut Off
Wall In The Earthfill Dam. Department of Public Works, Indonesia 2005.
1890
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik