4. STRENGTHENING RIGHT ABUTMENT WITH CONCRETE SHEAR KEYS
As mentioned above, faults F2 and F3 in the right abutment may affect the
stability of the right abutment against sliding. Geological investigation and
excavation revealed that fault F2, striking almost parallel to the flow direction and
dipping to the river bed at an angle of over 70°, cut through the whole right
abutment. The faults have a width of 0.01 to 0.3 m locally up to 0.5 m, and an
influence zone of 0.5 m locally 2.0 m thick. The faults have undulated face and are
filled with greyish green, pale yellow, greyish black fault gauge, mylonite, breccia
and calcite. The fill material is argillaceous cemented and squeezed firmly. The
faults F2 and F3 cut the rock mass in the right abutment into prisms and wedges,
jeopardizing the stability of the right abutment.
To improve the shear resistance of the faults F2 and F3 in right abutments,
several measures were studied and found that the most desirable solution to
secure and support the discontinuities is to use concrete shear keys. The shear
keys (also named replacement adit) can effectively increase the shear strength of
the faults. Furthermore, the seepage paths of groundwater along the faults can be
cut off, and consequently, the infilling of the fault gauges is protected from
deterioration [2]. Therefore, the stability of the dam and its foundation is ensured.
(a) (b)
Fig. 3 (a) Layout at El.660.0 m and (b) vertical section at Fault 2 of shear keys
At Gomal Zam dam, the shear keys in form of tunnel and shaft plugs were
implemented. In this system the tunnels and shafts were excavated along the faults
F2 and F3, and transverse connection tunnels were excavated between F2 and
F3, forming the sub-vertical spatial grids. Then the tunnels and shafts were
backfilled with concrete of C16 grade. As schematically shown in Fig. 3, the shear
keys were accomplished at three levels of El. 660.0, 690.0 and 720.0 m. Between
the shear keys at 690.0 and 720.0 m, two vertical shaft shear keys were
implemented. In the original design, the vertical shaft shear keys were planned to
be extended down to El.660.0 m. After excavation and re-evaluation of the actual
conditions of the two faults and re-analysis of the dam stability [3], the two vertical
shaft shear keys were cancelled.
Shear key (replacement adit) 1 for F2
Shear key (replacement adit) 2 for F3
Access adit to replacement adits
Fault F3
Fault F2 Concrete
Rock
660.0 m
690.0 m
720.0 m
Access adit 300x350
cmm
Rock mass
Concrete
Replacement adit (shear key)
Replacement shaft (shear key)
Replacement adit (shear key) 400x600 cm
Access adit
Grouting adit
1896
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik