Fig. 7. Chuspiri dam:
a) Site overview b) Start of filling
3.2. In North America
3.2.1 Diavik Diamond Mine (Fig. 8)
The Diavik Diamond Mine is located at 300 kilometres northeast of
Yellowknife, Northwest Territories of Canada on an island in the lake of Gras (water
the purest in the world). DDMI is the operator of the project. DDMI is a wholly
owned subsidiary of Rio Tinto, which is headquartered in London, England.
The choice of BGM was done due the extended period (10 months per year)
when it was able to install BGM. January and February were excluded due to very
low temperature met (-70°C).
On the same site, they would have been able to install only 4 or maximum 5
months per year.
Installation was completed by a local company based in Yellowknife, NWT,
specializing in geomembrane installation in cold weather conditions. A & A retains
the flexibility of BGM even when stored and unrolled at -40°C. No special
precautions such as inside tunnels were required during welding, which was
performed in the open air at -25°C and less till – 35°C.
The manufacturer monitor’s presence was required by the international
consultant (Golder Associates on their Vancouver and Yellowknife Canadian
subsidiaries) to train A & A Technical employees (Native people: Inuit) and ensure
that the installation work was done properly.
The second reason of the choice of BGM was the economy induced by the
high puncture resistance by BGM comparing with HDPE. Initially, the design
specified a 50-mm minus geomembrane bedding and cover material. Tests carried
out on site showed that a 150-mm minus material could be used for bedding and
cover without damage to the geomembrane. The 150-mm minus bedding material
was compacted then the surface was raked by hand to remove the larger particles
protruding above the surface. Cover material was dumped along the toe and
pushed by a track loader approximately two-thirds up the slope. Cover material
was then dumped along the crest and pushed by a track loader, down the slope
over the geomembrane.
1913
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik