Seite - 1926 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1926 -
Text der Seite - 1926 -
(a)
(b)
(c)
Fig. 7
Calculated performance index values in cross sections a) 2-2, b) 5-5, and c) 7-7
1510
1530
1550
1570
1590
0.0
0.1
0.2
0.3
0.4
0.5
k
Date
k(PPF2-1&PPF2-2)
k(PPF2-3&PPF2-4)
Dam body filling level
Reservoir water level
Start of
impounding
End ofconstruction
1510
1530
1550
1570
1590
0.0
0.2
0.4
0.6
0.8
1.0
k
Date
k (PPF5-1&PPF5-2)
k( PPF5-3&PPF5-4)
Dam body filling level
Reservoir water level
Start of
impounding
End of construction
1510
1530
1550
1570
1590
0.0
1.0
2.0
3.0
4.0
5.0
k
Date
k (PPF7-1&PPF7-2) k (PPF7-3&PPF7-4)
Dam body filling level Reservoir water level
Start of
impounding
End of construction
1926
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik