related to poor engineering design or construction then it would raise integrity
questions and should be avoided. The fundamental approach to data collection
and interpretation of geological conditions of dam foundation has suffered greatly
due to the lack of sufficiently allocated resources and time for site investigations
with the pressure to deliver faster but not necessarily the economic and safer
solutions. The “Why” question that should continue to persist in planning site
investigation logically has been unintentionally taken away. Site investigations
which used to be enhanced by local knowledge and experience are routinely being
ignored or not attended to, mostly due to budgetary and time constraints imposed
by the various stakeholders. A further trend is for stakeholders to persist with
original concepts much longer than they should be, even when initial indications
are that more economic and technically sound alternative solutions are available.
2. SUITABLE LARGE DAM TYPES FOR WEAK FOUNDATIONS
2.1. DAM TYPES
Traditionally rockfill dams with concrete spillways on one of the banks on
competent rock has been preferred in general for weak foundations. Morning glory
spillways have been a feasible but less preferred alternative for flood evacuation.
Where rockfill is not available in sufficient quantities or quality, earthen
embankments have been selected with similar arrangement for spillways and
alternatives.
Engineers, in the recent past have begun to consider composite dams for
very weak foundations. Composite dams provide a flexible rockfill dam for the
geologically weaker parts including over active and inactive faults and fault zones.
The relatively more competent part is set aside for providing a spillway section in
conventional concrete or RCC after appropriate foundation strengthening
treatment are undertaken, if required. Although there are several dams that have
been designed and built and in operations currently no guidelines exist for
engineering composite dams. This needs to be addressed by ICOLD at the earliest.
.
2.2. VERY WEAK FOUNDATIONS
Large dams have been built and will continue to be built on very weak
foundations that are poor. Engineers who have conducted routine finite element
analysis of large gravity dams on such foundations would have observed the
following:
1933
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik