This investigation only relates to the number of joints, regardless of their
effect on seepage). If the effect of joints with high angle compared to the joints with
low angle considered on the seepage, their weight effect will be considerably more
than the mentioned values.
Table 2
Summary results of classification with the angle of joints and fissures in the
limestone
Location 0-30 30-60 60-80 80-90 60-90 No. of Dis.
Z.1 36.3 28.9 11.8 23 34.8 780
Z.2 42.1 29.8 8.9 19.1 28 743
Z.3 41.3 21 9.4 28.3 37.7 520
Z.4 10.6 19.9 19.9 49.6 69.5 151
Joints with high angle have much more length compared to the joints with
low angle and length of up to 2.2 m reported in this project. These joints with
relatively high width lead to high seepage amount (specifically in zones 1, 2, 3 and
4). As the result, drilling the inclined curtain plane, which will provide the best result
in order to cover more joints.
4. SPATIAL LAYOUT OF THE GROUT CURTAIN AND TESTING
EXPLORATORY GROUT HOLES
Base on the primary site visit of the outcrop of the limestone (LW) in the
trench of the access way to the grouting gallery outlet portal, engineering judgment,
and work experiences dip and dip direction of discontinuities are such as 210/74,
104/80, 050/83 and 180/80. This limestone has outcrops in both slopes of the
gorge and in the Glevard dam axis; and LW (White Limestone) limestone include
milky white, fine-grained, crystallized and dense limestone with average to high
compressive strength and high weathered. They are quite different in terms of
different tectonic effects, weathering, color, Karstic event, crushing, joints and
fissures, filling, etc. However, generally, there have also vertical open joints with
medium to high permeability in this area. As the spacing and number of these four
joint sets are not available (in the report), it is not possible to use the method
suggested by Zhou and Maerz (2003) in finding the spatial layout of the grout
curtain [1]. As for a more appropriate evaluation, estimate of the weight of the joint
sets is needed, the simplest method which is the homogeneity of the frequency of
the joint sets. According to the result of this method, inclined boreholes are more
efficient than vertical boreholes (figures 8 & 9).
1963
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik