Seite - 1974 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1974 -
Text der Seite - 1974 -
dips, which belongs to the values of f3 and m'. If the dip of these boreholes is not
known, there is no way but to change their dip direction.
5.1. FIRST BENDING PART (D=24°)
For 140 degrees borehole direction: 13=64, m'=13.35, 0=73.5 and they are
resultant would be a borehole of 140/73/5. For 50 degrees borehole direction: f=26,
m'=27.37, 0=58.7 and their results would be a borehole of 50/58/7. If the borehole
dip direction is selected as 70°, p=46° and m'=16.68 and the dip gradient will be
69.6 or 70°, which is more appropriate.
5.2. SECOND BENDING PART (D=40°)
For 140 degrees borehole direction: 13=80, m'=12.19, 074.8, with a 140/75
view.For 50 degrees borehole direction: 13=10, m'=69.11, 0=33, with a 50/33 view,
which is not appropriate (the dip is very slight) and if the dip direction is 90°,
borehole dip will be 71 degrees (P=50, m'=15.66).
Zonation of the G1 access tunnel based on the direction of its bending part,
has been carried out with the view that the bending parts are replaced with straight
parts, so that the ratio of the straight part, (li), to its bending part (Ci) is not less
than {li/ci} ≥ 0.95. The straight part of the tunnel is 130 m long, which considered
as the starting part of the access tunnel. The straight part, with a length of 40 m,
has been replaced for the 41.5 m long first bending part (with a ratio of 0.96) and
the second bending part which is 52.8 m long and its straight part which is 52 m
long will provide a ratio of 0.98 (figure 4).
Access tunnel G1 is located at El. 740 — 743 m.a.s.l. and based on
boreholes 01 and 01G, Shemshak Formation with very low permeable to
impermeable is located at 150 m below the access tunnel (El. 590 m.a.s.l).
Therefore, at least two galleries parallel with the access tunnel and below is carried
out for grouting purpose. Gallery G2 has been foreseen 45 m below the G1 at (El.
695 m.a.s.l) and dip and gradient of the grout galleries was estimated based on it.
6. FINAL TECHNICAL NOTE
With regard to the explanations provided above, following complementary
notes, along with some figures and diagrams seem to be useful for a better
understanding of the described technical points. So the following notes provided
hereunder:
1974
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik