Seite - 1983 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 1983 -
Text der Seite - 1983 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
CASE STUDY: ITUANGO HYDROELECTRIC PROJECT-ADDRESSING
GEOLOGICAL AND GEOTECNICAL ISSUES ON THE ROCKFILL-CLAY
CORE DAM'S FOUNDATION DESIGN *
Maria C. SIERRA
Director of geotechnical department at Integral consultancy company
Juan E. MUNERA
Senior civil engineer Integral consultancy company
COLOMBIA
1. ABSTRACT
The most important hydroelectric project in Colombia's history, located
171 km north of the city of Medellin (Fig. 1), HydroItuango will begin to operate
partially in 2018 and with its full capacity in 2026. With 2400 MW of installed
capacity distributed in eight Francis turbines, this megaproject icon of the
Colombian engineering has presented many challenges before giving its light.
* Étude de cas: Projet hydroélectrique d’Ituango – Relatif aux affaires géologiques et
géotechniques dans la conception de la fondation du barrage en enrochement avec cœur
d’argile.
1983
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik