SEALING WORKS WITH MICROFINE CEMENT AND SYNTHETIC RESIN AT
THE CATHALEEN’S FALL DAM, IRELAND
-
LOW PRESSURE GROUTING OF POROUS MASS CONCRETE
Ing. Kurt KOGLER
Project Manager, ZÜBLIN SPEZIALTIEFBAU GES.M.B.H.,
AUSTRIA
Dipl.-Ing. Johann HECHENBICHLER
Senior Site Manager, ZÜBLIN SPEZIALTIEFBAU GES.M.B.H.,
AUSTRIA
Dipl.-Ing. Patrick GABRIEL
Site Engineer, ZÜBLIN SPEZIALTIEFBAU GES.M.B.H.,
AUSTRIA
Harry DOHERTY B.Eng. (Hons), CEng., MIEI, MICE
Civil Engineering Manager, Donegal Stations, ELECTRICITY SUPPLY BOARD,
IRELAND
1. INTRODUCTION
The Cathaleen´s Fall power station is a hydroelectric power plant, located on
the river Erne at Ballyshannon in County Donegal, Ireland. It is owned and
operated by the ESB (Electricity Supply Board) Group. The construction of the
concrete gravity dam started in 1946 and was completed in 1955. The dam is about
256 m long and 10 - 27 m high and has an installed capacity of 45 MW. The
associated reservoir has an area of 2 km². The catchment associated with the river
is just under 4,350 km². To discharge floods, the dam is equipped with 3 spillway
gates, each about 11.0 m long.
1994
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik