2. CONCEPTS AND METHODS
2.1. CONCEPTS ON DAM OPERATION AND MAINTENANCE IN KARSTS
In general, the Bribin dam operations procedures mainly use the Standard
Operating Procedures as the results of lengthy studies within the research
cooperation of the German-Indonesian team (3). The lists of core duties:
Heighten safety standard for a dam in Karst: concrete dam construction
Dam operation rule curve: water level monitoring
Hydrological data: upper stream precipitation data
However, as not much literature is found on dams in Karst, let alone an
underground one. This condition places the case study in a unique position and a
fragile one. The Bribin dam is the first attempt of its kind to be located in
Indonesia. Earlier attempts were involving weir and PaT scheme, but not a whole
cave structure as in Bribin. The literature review is using the Scopus indexed
titles are reviewed on 78 titles, which then eliminated to 14, out of which three
were about Bribin. These papers relate directly to underground dams in Karst
area construction. Based on these, an overview of what to be expected in dealing
with the maintenance of a dam in Karst areas are highlighted as the following
check-up activities on:
Equipment (pump, turbine, etc.)
The behavior of the underground reservoir (Karstification, flood, etc.)
Continual watertight structures (suspended grout curtain)
Instrumentation for geological deformations (piezometer, etc.)
In this research, some of the following concepts are defined for the context
of Bribin Dam: (1) normal operation, (2) flood operation, and (3) maintenance.
Each of these concepts plays an important role in the daily activities of the Bribin
Operation Team as they work 24 hours non-stop. To understand these
definitions, the way the PaT system works in Bribin. This system is completed
with the ASK and RKV modules as an additional by-pass (added in 2012 after the
big flood in the rainy season of 2011/2012).
Firstly, in normal operation pattern in 2011-2016, it includes the condition of
water level between 13-15 m. For this pattern, the required data to be calculated
would be average discharge and yields annually compared to total annual
discharge and yields ranging. Additional data to be compared would be annual
rainfall pattern and its correlation to the discharge. This pattern also would
highlight normal operation activities by the team. Second, flood operation is when
the highest water level will be more than what the modules were designed for.
Thus, the PaT will stop operating. The flood happenings set its pattern, which
disturbs the normal pattern. This pattern related to the normal should be recorded
for future data analysis. Third, the maintenance definition is when downtime is
2008
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik