However, based on the interviews with the team members: the team does
regular two times daily checkup to the platform (in morning and evening), using
the generator run elevator. The main concern of the team; the electricity used for
the elevator, the seepage submersible pump, and the instrumental components
on the platform is also high, which made the operation of the dam not 100%
electricity free as what the KIT suggest. Daily checkups consist of (1)
temperature check, when it is over 90’C the module has to be stopped, but when
under it, the module works continually, (2) seepage calibration, whether the
sensors are working correctly and the submersible pump running, (3) nanometer
check, whether it is showing the same number as the panel on the ground.
Without the daily checkups the platform could be flooded, and the PaT cannot
work effectively.
Fig. 3
The condition of Bribin in 2012-left (10) and 2016-right (BBWS SO
documentation)
3.3. HISTORICAL REVIEW
This Bribin Dam review (shown in table 2) at the operational phase starts
from 2010 to 2017. Reports, interviews, and notes on the dam operation and
maintenance are used came from different sources: the German team and BBWS
Serayu Opak team. These reports will be arranged using a timeline to compare
and analyze also triangulate using Atlas.ti software to find the patterns of
operation and maintenance of Bribin. The following patterns will be sought and
numbered as (1) pattern of normal operation, (2) pattern of flood operation, and
(3) pattern of maintenance, M for medium scale and L for large scale. The BBWS
SO does all the operation, while the maintenance activities were done jointly.
From 2010 to 2014, the KIT did the maintenance, while from 2015 and on, the
BBWS SO fully maintain the Bribin II. Aside from these activities, the KIT
provides annual assessment and monitoring, also consultation. However, the
Bribin team at BBWS SO did most of the ground works and since 2014 has been
self-reliant to operate and maintain Bribin II.
2011
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik