Table 2
Activities in Bribin Dam O&M (2010-2017)
Year Condition Operators Activities Type Information
2010 Normal KIT &
BBWS SO The first operation
of Bribin Dam 1 Water level starts at 13m for the
initiation of the operation
KIT Modules
maintenance 3-M Spare part change
2011 Normal BBWS SO Operation 1 Water level at 13m
Flood BBWS SO Stop operating 2 Water level +15m
Normal KIT Modules
maintenance 3-M Spare part change: all modules
2012 Normal BBWS SO Operation 1 Water level added to 14m, as
discharge became more reliable
Normal KIT Modules
maintenance
By-pass installed 3-L Spare part change: all module
Additional ASK and RKV modules
2013 Normal KIT Grouting campaign
3
Modules
maintenance 3-L Each grouting campaign has a risk of
hydraulic breakthroughs
Spare part change: all module
Flood BBWS SO Stop operating 2 Water level +20m
2014 Normal BBWS SO Operation 1 Water level at 14m
Normal BBWS SO Modules
maintenance 3-M Spare part change: all modules
2015 Normal BBWS SO Operation 1 Water level added to 15m
Normal KIT Installing hanging
structure 3-L To strengthen cave walls and lessening
vibration
Normal BBWS SO Modules
maintenance
coupling change
Elevator change 3-L Rubber coupling and bearing of the
PaT modules, spare part change, a
safer elevator (with counterweight) and
more efficient model (40kW to 15kW)
2016 Normal BBWS SO Operation of Bribin
Dam 1 Water level at 15m
Flood BBWS SO Stop operating 2 Water level 34m (October)
Normal BBWS SO Modules
maintenance 3-M Spare part change: all modules Ring
installations on the bypass
2017 Normal BBWS SO Operation of Bribin
Dam 1 Water level at 15m
Normal BBWS SO Modules
maintenance 3-M Module 1, 3, 4, module 5 (shaft sleeve,
etc.)
Flood BBWS SO Stop operating 2 Water level up to 64m and error
occurred
3.4. NORMAL OPERATION
Like any other dam operation pattern, Bribin’s is also based on the water
level in the reservoir. As the water discharges in underground streams also
based on the rainfall, although it needs some time (5 hours) before reaching into
Bribin. Thus, there are three basic patterns, wet year, normal year and dry year
(PP No.37 on Dams). Indicators of wet, normal and dry are based on rainfall data
in Gunung Sewu catchment (2). During normal operation, the current water level
is maintained at 13-15m in the reservoir. This condition is due to the supply
needs for the drinking water has to be between 40l/s to 60l/s. The PaT is
automatic and works 24/7. However, monitoring of the water level also uses
human to guard at all times in responding to a sudden change of the upstream
condition, especially during rainy seasons. At least twice a day, the O&M team
has to check the water level also the PaT condition (temperature, seepage, etc.)
2012
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik