2.2 Inlet structure: Inlet transition facilitates the flow acceleration, ensuring the
transition from subcritical flow which is established upstream in the reservoir
created by the construction of the cofferdam or, in some cases, the channel
connecting the bed to the frame, to supercritical flow that occurs in the diversion
tunnel. The implementation of this structure aims to promote sufficient air to the
flow, so that it develops a pressure equal to atmospheric pressure along the
tunnel. This avoids the possibility of reaching pressures near the water vapour
pressure, reducing the risk of cavitations phenomena in the diversion tunnel and
hence its erosion. Regarding installation of the inlet structure it may be
implemented directly on the ground or resort to auxiliary concrete that supports it
above the ground level.
For smooth entry of water in to the depletion tunnel, generally following elliptical
equation is used
(1)
In the inlet structure design it is important to proceed to the analysis of flow
velocities that are practiced within and upstream the structure. To this end, the
ratio of the velocity flow in the control structure and velocity flow upstream the
structure must be in a range of 2 to 5. In order to drain maximum water
sometimes no curve is provided to bottom surface of tunnel which is in touch with
invert of approach channel. The flow separation may occur in the transition river
section with irregular section for the tunnel section, usually circular or horseshoe
sections are used.
3.0 Geometric design
Sections usually adopted for tunnels are covered in IS 4880 (Part III, Hydraulic
design) -2000[1]. Five basic design steps are outlined below:
The functional requirements are defined in a broad sense. They include all
hydraulic and geometric requirements, ancillary and environmental requirements
and limitations, logistics, and maintenance requirements.
Cross section: Area of cross section of a tunnel shall be of sufficient size ‘to carry
the maximum required flow on the head available and in addition shall conform to
construction requirements.
Tunnel dimensions should be decided on the basis of economic studies so as to
obtain a most economical section. The following should be taken into account:
Discharge passing through the tunnel flowing partial full is given by:
𝑄 = 2
3 𝐵 𝐶
𝑑 √2𝑔 𝐻 2
3 (2)
Where Q= Discharge passing through the tunnel in m3/s
B= Width of tunnel in m
Cd= Coefficient of discharge 1
33.0 2
2
2
2
D
y
D
x
2019
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik