4.0 DIVERSION-CUM-DEPLETION TUNNEL – DOYANG
PROJECT,NAGALAND
The Doyang H.E. Project envisages generation of 75MW power. It is located on
river Doyang in Wokha district of Nagaland State. Project comprises 87.5 m high
and 462 m long rock fill dam. During construction of dam river flow is proposed to
be diverted through a 12 m dia. Diversion tunnel 633 m long is designed to pass
the maximum flow of 2298 Cu.m per second. After construction of dam, it is
proposed to make use of major part of diversion tunnel for depletion purpose by
connecting it to the reservoir through 6.0 m dia. depletion (Gooseneck) tunnel.
During depletion stage of reservoir, gooseneck tunnel is to be operated under
maximum head of 37 m and discharge of 568 Cu.m per second.
General lay out plan of the project showing alignment of diversion tunnel,
location of control gates, energy dissipation arrangement is shown in figure 1.
Figure 1.Alignment of diversion tunnel showing location of control gates, energy
dissipation arrangement
SALIENT FEATURES OF DIVERSION-CUM-DEPLETION TUNNEL,
DOYANG H.E. PROJECT, NAGALAND
(I) DIVERSION TUNNEL
Size of bell mouth entrance : 9.5 m x 12 m
Length of transition : 10.4 m
Diameter of tunnel : 12.0 m
Length of diversion tunnel : 633.0 m
El. of tunnel entrance : 255.0 m
El. of tunnel exit : 254.37 m
Design discharge : 2298 Cu.m/sec
(II) DEPLETION(GOOSENECK) TUNNEL
2022
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik