since epoxy is a hydrophobic material, it is required to keep the painting surface
clean during the coating construction. For the shafts and deviated wells and other
special parts, the coating or brushing operation can be carried out only when the
grouting facilities are operating. In case of foggy weather, there will be a very
serious fogging and condensing phenomenon in the shaft as the main air
ventilation channel of diversion tunnel during the brushing or coating construction,
so, the brushing test at this site is basically failed. For this reason, Qingyuan PSPS
only brushes or paints the protective materials of limnoperna fortunei at outlet/inlets
of lower/upper reservoirs, upper adit, middle adit, deviated wells, lower adit, HP
bifurcated pipe, tail water concrete branch pipe, tail water bifurcated pipe and tail
water tunnel.
5.4. COATING PROCESS
5.4.1.Coating/brushing procedure:Epoxy coating operation is divided into
two stages. Epoxy coating operation of erosion resistance of concrete above 3m
at the bottom will firstly be carried out, and then the epoxy coating operations of
erosion resistance of concrete at the bottom and below 3m will be performed.
During the coating operations, the concrete grouting scaffold is used as the coating
work plant. The basal plane is flushed from top to bottom and after it is dried and
accepted, it shall be coated or painted also from top to bottom.
5.4.2.Coating Process
(1) Install and check the equipment of work plant to ensure the construction
safety.
(2) Before the formal construction, check the construction surface 4 hours in
advance to ensure that the concrete surface is dry during the construction.
(3) The coating operation direction is initially determined from top to bottom
and it can be adjusted according to the actual situation on the site during the actual
construction. The airless high pressure sprayer is used and the body pressure of
the sprayer is 12MPa and the outlet pressure is controlled below 1MPa. On the
work plant, the spraying nozzles are tied onto the bamboo poles of different length
for the coating operations. The long bamboo pole is used to spray the remote ends,
and the short bamboo pole is used to spray the near-ends. The length of the
bamboo poles is determined experimentally to ensure they can cover all ranges.
The nozzle shall be perpendicular to the concrete surface and at 30 -50 cm away
from the concrete surface. The prepared paints shall be transported to the storage
tank on the work plant through a high pressure hose.
(4) The concrete surface shall be brushed or sprayed twice. For the first
spraying operation on the adit wall, the spraying shall be performed along the
structural surface from top to bottom. The second spraying operation shall be
performed perpendicular to the first spraying direction. The spraying operations
shall be performed along certain direction and law to ensure all concrete surfaces
2040
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik