details in the successive steps in the failure process had defied prediction. The
experienced problems essentially derive from an unforeseen instability of the
hydrogeological regime, which is attached to several features: the temporarily
blocked drainage of the TfX layer, the dispersivity of the TfX (not detected
previously in the project area), which permitted rapid piping, and the clastic dyke,
which promoted hydrojacking and with its erosion paved the way to the failure.
1. Internal Pressure P=84m. Hydraulic
jacking opens cracks in concrete and
starts jacking in rock. Limited leakage 2. Piping and erosions along clastic
dyke, full internal pressure builds in
clastic dyke, damage to rock pillar and
local loss of stress
3. Severe damage to rock pillar. Piping
in TfX opens outlet to ground surface.
Vertical offset of tunnel crown, start of
collateral damage. Seepage 1.5m³/s 4. Propagation of damage along
tunnel. Erosion and piping continue.
Seepage increases to 1.8m³/s
Figure 8
Sketches illustrating significant steps in the development of the failure
Croquis illustrant les étapes importantes dans le développement de la rupture
2077
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik