CONSTRUCTION AND MONITORING OF POWERHOUSE CAVERNS
THE CIRATA HYDRO POWER PLANT
Pangestu Dwipa Airlangga
PT PEMBANGKITAN JAWA BALI
INDONESIA
1. INTRODUCTION
Powerhouse construction of PLTA Cirata (Hydropower Plant of Cirata) is
located underground with 1.008 Mega Watt (MW) of installed capacity and the
mean annual generation of electrical energy is 1.428 Giga Watt hour (GWh). To
produce 1.428 GWh, eight turbines are operated with the capacity of each turbine
is 126.000 KW and 187,5 RPM for rotative speed. The effective head through
penstock is 112,5 meters and the water discharge is 135 m3 per second. The
tunnel (an excavation area) below the rock mountain is one of the largest Power
House Caverns constructions in the world by regarding to its wide. The
construction which is located among the rocks will be affected by enormous
pressure from the surrounding rocks; therefore the design of the tunnel is made as
it aims to limit the impact of pressure from the rocks as small as possible.
For the construction design of PLTA Cirata, it had been chosen the shape
for the tunnel which is rather curved similar to egg shape. The decision was made
by considering the simulation result using structural software and the number of
stress for reaching the stability of underground structure. Oval tunnel has certain
area which is affected by certain stress that is limited to shallow area, so the
structural stability becomes better. Since the benefit obtained from the oval shape
is very large, thus, the oval shape like egg shape for the tunnel shape is decided
for the underground building of PLTA Cirata.
The structure of Power House Caverns of PLTA Cirata has 320.000 m3 in
volume with longitudinal dimension of 1300 m2, 49,5 m of the height and 35 m of
2106
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik