Seite - 2113 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 2113 -
Text der Seite - 2113 -
REFERENCES
[1] PT PJB CIRATA RESERVOR MANAGEMENT UNIT, Laporan Operasi,
Pemeliharaan, dan Pemantauan Waduk, Bendungan dan Power House
PLTA Cirata, Bandung Barat, 2017.
[2] PT PJB CIRATA RESERVOR MANAGEMENT UNIT, report of maintanance,
Dam dan Power House Monitoring Cirata Hydro Power Plant, Bandung
Barat, 2017.
[3] STATE MINISTER OF PUBLIC WORKS AND PUBLIC HOUSING, Ministry
Regulations Number 27/PRT/M/2015 About The DAM, Jakarta, 2015.
[4] PT PJB CIRATA HYDRO POWER PLANT UNIT, Large Inspections of Cirata
Dam and Complementary Buildings , Bandung, 2010.
[5] PT PJB CIRATA HYDRO POWER PLANT UNIT, Report of Assesment
stability Tailrace Tunnel PLTA Cirata, Bandung, 2013.
SUMMARY
The construction of Power House Caverns of PLTA Cirata has 320.000 m3
in volume with longitudinal dimension of 1300 m2, 49,5 m of the height and 35 m
of the width of the tunnel. This construction was built by using Geo New Austrian
Tunneling Method (NATM) in 1984. The cavern structure reinforcement used rocks
around the tunnel as the prior buffer, then it was shotcrete-lined and it was
reinforced by rock bolt and pre-stressed concrete. Since NATM was a method for
rational construction by using surrounding rocks as the buffer, so it was very
important to do monitoring towards the change of the rocks regularly and to keep
the safety and the reliability of the underground construction; the monitoring and
maintenance activity towards caverns wall were implemented.
The monitoring and maintenance system for the safety of Power House
Caverns structure of PLTA Cirata, which had been operated for 30 years, are
regularly implemented every month. The monitoring activity uses three
instruments, i.e. Rock Displacement Extensometer, Crack Displacement Meter,
and Convergenmeter. The instruments of Power House Caverns of PLTA Cirata
were installed when the cavern construction is being built.
The monitoring system towards Power House cavern of PLTA Cirata was
being done regularly by PT PJB. Monitoring was done by using three instruments
where each of the instruments had different monitoring function. On the cavern age
which almost reached 30 years, the monitoring showed that the construction
behavior was categorized as normal.
Key word: Construction, Monitoring, Power Plant, and Cirata
2113
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik