dam built to increase the storage volume of the lake Mutt. A comprehensive
hydrogeological and geotechnical in-situ testing and monitoring program was
implemented [1]. An overview is given in Fig. 1.
Fig. 1
Overview of the pumped-storage power plant Limmern
2. PRELIMINARY IN-SITU TESTS
The central cavern is partly located in the Quintner limestone of Malm and
Cretaceous origin with locally developed schistosity and karst formation. Because
of the extension of the caverns, the hydraulic and rock mechanic properties were
estimated during a preliminary investigation phase. Therefore, in-situ tests were
performed in ten boreholes between horizontal and upwards vertical direction
with a diameter of 96 mm (HQ) and a length of maximum 130 m. The locations of
the boreholes are shown in Fig. 2. The main goal of these in-situ tests was:
- Information on rock structure, schistosity, fractures, faults, karst
- Determination of the mechanical rock properties, elasticity and deformation
moduli through dilatometer tests
- Determination of the minimal principal stresses through hydraulic fracturing
tests
- Identification of water-bearing features and determination of static formation
pressures and rock permeabilities through hydraulic tests.
2131
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik