SIPHON INTAKE AS SHPP INTAKE & WATER WAY, A SOLUTION DESIGN
FOR SECURING THE LEFT BANK OF WLINGI DAM IN BLITAR, INDONESIA
Ulie Mospar Dewanto
Deputy of Operational II, JASA TIRTA I Public Corporation
Gede Nugroho Ariefianto
Chief of Water Supply and Hydropower Division, JASA TIRTA I Public
Corporation
Bayu Pramadya Kurniawan Sakti
Civil Engineer of Water Supply and Hydropower Division, JASA TIRTA I Public
Corporation
INDONESIA
Wlingi Dam in Blitar, East Java Province, Republic of Indonesia is a
multipurpose dam which one of the purposes is to supply Lodoyo Irrigation Area in
Blitar and Tulungagung District of 12,687 Ha, through Lodagung Irrigation Canal.
According to the importance of this food security infrastructure, the guarantee of
discharge dependability becomes an absolute necessity. The outflow for irrigation
is 8.89 m3/s to 13.78 m3/s that is available throughout the year. There is also a
gross head of 12.50 m between the water level on Wlingi Reservoir and after canal
escape. Thus, the availability of head and discharge make the potential of
additional small hydroelectric power plant (SHPP) in Lodagung Irrigation Canal
sounds very promising.
Jasa Tirta I Public Corporation, a State-Owned Corporation on Water
Resources Management in the Republic of Indonesia has been constructing SHPP
Lodagung 2x850 kVA since August 2016 and scheduled to be completed on
December 2017. This project is expected can meet the lack of electricity supply
that has been relied only on two local hydropower plants, HEPP Wlingi and HEPP
Lodoyo with total installed capacity of 75.38 MVA. These supplies have not
increased since 1983, whereas in 2010 the peak load exceeded 75 MVA and in
2017 is projected to be at 92 MVA.
The Wlingi Dam itself encountered geological problems during impounding
in 1977. At that time, there was an excessive leak in the formation of lime soil, in
form of seepage in left abutment of the dam. The seepage appeared also in the
raising of well water level in the village around downstream of the dam and reached
parallel to the yard. The investigation was conducted on 12 February – 14 March
1978 using radio isotope tracer with “multi well technique” method. Radioisotope
Cr51 and Br82 injected into a borehole and then observed on the other holes. The
investigation concluded that seepage raised on the left bank of the dam, mainly
through the upper part of the limestone rock and centered near the irrigation outlet.
Then the problem was dealt with the three curtain grout lines on the left bank area,
and until now is an effective treatment.
2142
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik