Crossing curtain grout lines that intersect with the irrigation canal, so far
become the most economical path for intake pipes and penstock. However
excessive digging will surely disturb curtain and have bad impact on overall dam
safety. Therefore, the design of the intake and water way are planned to be placed
on top of crest dam. Siphon intake that made from steel pipe was chosen as a best
solution for the design, even though need precise hydraulic calculation to ensure
that it will work properly. The challenge is that it will be also the first application for
hydropower intake and water way in Indonesia.
Siphon intake was designed by steel material SS 400 with specification
technical data: 2 units each diameter 1.5 m, thickness 10 mm, length 60 m. The
specification technical data of penstock i.e.: Inner Diameter 2.5 m, thickness
section-I 10 mm with length section-I 315 m, thickness section-II 12 mm with
length section-II 30 m, total length 345 m. After the installation and construction
works has completed in January 2018 since construction works started in August
2016 (18 months), the system performed well. The turbines and generators worked
with the pressure in penstock similar with turbines in range 0.83 – 1.03 bar with
output capacity of each turbine 407 – 643 kW.
(Keywords: SEEPAGE, SIPHON, POWER PLANT)
2143
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik