1. Introduction
1.1 Background
The deficit of electricity supply in Blitar Regency, East Java Province,
Republic of Indonesia was strived to be fulfilled by the development of hydro
electricity. The supply of electricity by HEPP Wlingi and HEPP Lodoyo of
75.38 MVA through the Wlingi Substation has not increased since 1983, while
the peak load of the surrounding areas of Blitar and beyond has exceeded 75
MVA after 2010. In 2017, the peak load is projected at 92 MVA. In accordance
with Government of Indonesia policy set forth in Power Supply Business Plan
(RUPTL) 2015-2024 (PT PLN (Persero), Electricity Supply Business Plan
(RUPTL) PT PLN (Persero) 2015-2024 Jakarta, 13 and 25. ) that every new
primary source of local electrical energy derived from renewable energy, i.e
geothermal and water power, can be fed in directly to the power network
system whenever it is available. This is one of a government policy for climate
change mitigation.
There was a potential of hydroelectricity that can be generated in
Lodagung Irrigation Channel, one of the Multipurpose Dam “Wlingi” facilities
in Blitar. One of the development goals of Wlingi Dam was to supply irrigation
demands for agricultural land in Blitar and Tulungagung regencies and
operated since 1978. Water from the Wlingi Dam is flowed through Lodagung
Irrigation Channel to irrigation area of 12,687 Ha. Considering the important
role of the irrigation infrastructure, the guarantee of water availability
throughout the year becomes an absolute demand for farmers. Maximum
outflow for irrigation water is 13.78 m3/s with probability 2.70%, while
minimum is 8,89 m3/s with probability 97,30%. The Wlingi Reservoir has a
high water level at El + 163.50 m, normal at El + 162.00 m, and average at El
+ 162.75 m. The water level ini irrigation channel in the lowest segment after
the plunge escape regulator is at El + 150.25 m. From the data there is a
gross head of 12.50 m. The availability of heads and constant discharge
makes the potential of electricity in Lodagung Irrigation Channel was feasible
to be realized.
But, there is an important issue that must be considered if the hydropower
potency in Wlingi Dam will be generated. That is “How to flow the water from
reservoir to power house without build an intake and water way with excessive
digging?” There are two reasons why it should be built on that condition. First,
Wlingi Dam itself encountered geological problems during impounding in
1977, then the problem was dealt with the three curtain grout lines on the left
bank area, and until now is an effective treatment. Excessive digging will
surely disturb curtain and have bad impact on overall dam safety. The second,
the strength of the existing irrigation conduit channel initially designed for free
flow, so when connected to the penstock it becomes a pressurized counduit.
It will result significant construction works on left bank of the dam if the existing
conduit is connected to the penstock. The strength of the conduit channel
strengthens the motivation to design the intake and water way at Lodagung
Hydropower does not connect to existing irrigation conduit outlet.
2144
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik