3. Discussion
The power plant utilizing the Lodagung Irrigation Channel is a small-scale
hydro power plant, hereinafter called Lodagung Small Hydro Power Plant
(SHPP Lodagung), located in Jegu Village, Sutojayan District, Blitar Regency,
East Java Province. Discussions on the power plant plan are as follows:
3.1 Capacity of Power Generation and Annual Energy Production
The installed capacity (P) and annual electric energy (E) capacity are
calculated as follows equation [1] and [2]:
P = g x Q x H x
T x
G
= 9,81 m/s2 x 14 m3/s x 10,30 m x 0,925 x 0,97
= 1.276 kW installed capacity = 1.300 kW (common value)
E = x P x 8.760 hours
= 83,43 % x 1.276 kW x 8.760 hours
= 9,325 GWh
3.2 Main Building Arrangement
The optimization of SHPP Lodagung layout is based on survey
measurement and field condition identification to determine the location of
penstock and powerhouse, with the following development criteria:
a. Determination of the location of the penstock to the powerhouse refers
to the longitudinal section of Lodagung Irrigation Channel.
b. Determination of the penstock line is made by avoiding turns with sharp
angles, with the shortest length to minimize losses, and is in a good
soil structure and stable.
c. Determination of powerhouse locations in areas with good accessibility
and location stability, located not far from the tailrace outlet.
d. The location of SHPP Lodagung building placement (penstock and
powerhouse) also consider the topography, geology, access roads, the
nearest 20 kV transmission line.
Conditions that must be considered is the geological history when
impounding Wlingi Reservoir in year of 1977 in the form of excessive
seepage on the left back of the dam (left abutment). The investigation was
conducted on 12 February to 14 March 1978 with tracer technique. Tracers
use the radioisotope Cr51 and Br82 with multi well technique, ie the tracer
is injected into a borehole and the observations are performed on other
holes. The investigation concluded that the seepage encountered on the
left back of the dam came from the eastern direction veering northwest to
tailrace hydropower. Details of the conclusions on the seepage description
are described as follows:
a. Right abutment area there is no seepage from the reservoir on the right
side downstream.
b. Seepage occurs in the left back area mainly through the upper part of
the limestone rock.
2146
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik