c. Direction of seepage in the left back area is concentrated to the left
open channel area near the irrigation outlet, then flows to the tail race
area through fractures in the rock chalk.
d. There is direct seepage from the left side reservoir area (see
attachments 1 and 2: C-11 and C-20) to the power house (PH)
hydropower and spillway (SPL).
Impounding of Wlingi Dam in 1977 had a problem of water leakage in the
formation of lime soil that resulted in raising of the land water table. The
elevation caused the well water to reach parallel to the land in the
settlement of residents around the downstream of the dam or powerhouse
of hydropower. To overcome it then the protection with 3 (three) curtain
grout path in the left bank area / left bank body dam were built. The
"Additional Curtain Grout Line Section I, II and III" show the location of the
intersection of the three curtain grout lines located near the conduit
channel outlet of Lodagung Irrigation Channel. One path of curtain grout
consists of two types, namely:
a. The inner side adjacent to the reservoir is 2 (two) cement grouting lines;
b. The outside as a curtain is 1 (one) line of chemical grout.
The initial phase of the study was to establish the main structures of
SHPP Lodagung and its layout taking into account the geological
history during the implanting of the Wlingi Reservoir in 1977, thus
setting the following structure:
a. The generator discharge is taken directly from the reservoir using the
siphon pipeline intake. The siphon pipeline intake is the most likely
design to be realized because it does not modify the irrigation conduit
channel based on the dam safety considerations.
b. After being sucked by the siphon pipes, water flows to the pipe
(penstock) on the left and parallels the open irrigation canal.
c. Consideration for optimum head and dam safety, which is the minimum
of vibrations occurring to the dam body during construction, the power
house is placed more than 400 meters from the dam near the escape
gate.
d. The flow of water coming out of the turbine (draft tube) is redirected
back to the tailgate and returns to Lodagung Irrigation Channel. This
design will keep water allocation for irrigation is still full filled
3.2.1 Intake
The design of the selected intake building is siphon pipes and it is
decided that irrigation conduit outlet lines are not disturbed. The
siphon intake design and water way are planned to be placed on top
of crest dam, and sucked water from Wlingi reservoir without pump
or other mechanism except first pumping to make pre-condition of
water pressure along the pipe. Then, waterflow goes down to
penstock and finally run the turbine. The system, therefore needs
2147
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik