precise hydraulic calculation to ensure it will work properly.
Consideration of choosing the intake design are:
a. A similar risk during impounding in 1977 is worried to recur when the
existing curtain grout layer is disrupted or broken by heavy engine
vibration or deep excavation in the area around the irrigation outlet
located on the third intersection of the grout path.
b. The strength of the existing irrigation conduit channel originally
designed for free flow. When connected to a penstock, it will become
a pressurized channel then, and the strength of conduit will not be
adequate. So, new intake was designed and use siphon intake system.
Data planning intake siphon as follows:
Design discharge = 14 m3 / s @ 7 m3 / s
Number of siphon pipe = 2 units
Siphon pipeline length = 60 m
Elevation of the dam peak = +167.00 m
Upper elevation siphon pipe = +168.50 m
Low water level = +162.00 m
Suction head siphon on low water level = 6.5 m (ΔH critical)
Suction head maximum = 7.11 m
Total Gross Head = 2,20191 m
The calculation of siphon intake based on equation [3] and [4]:
C =
g
V
ossTotalHeadL
siphonk
d
L
2
21
1
1 1
=
)81.92/(96,3
20191,2
21
1
x
= 0,556
Q = CA √2gH = 0,556 x (π x 1,52 / 4) x 50,1281.92
= 15,38 m3/det
Based on the calculation obtained the maximum discharge (without
regulation) on the channel of 15.38 m3/s. With the help of pipe
regulation, the design discharge 2 x 7 m3/s using 2 pcs of 1.5 m
diameter then the water velocity in siphon pipes is 3.96 m/s. Suction
head siphon on low water level (6.5 m) is lower than Suction head
maximum (7.11 m).
The siphon method of operation is a filling method that utilizes pressure
differences due to the high difference between upstream water level
(reservoirs) and turbine inlet valves. The way it works are described
consecutively, firstly, the turbine inlet valves at the end of the penstock
are closed, fulfill the pipe with water, using small pump to make desire
vacuum condition at beginning of siphon until penstock so that due to
the difference water pressure, water from the reservoir will be
constantly inhaled and rotating the turbine. The tip of the siphon pipe
is fitted with a litter filter and a rough material (trash rack) that protects
the area around the end of the pipe. Its function is to select the material
2148
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik