Seite - 2172 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 2172 -
Text der Seite - 2172 -
Hollowcone equipment is under the morning glory tower which is a tower
structure made from concrete that has an outside diameter of 90 m and height 110
m. This tower function as main valve (spillway threshold elevation ±107.00 m)
and hollow cone valve is located on el. 49.00 m. Morning Glory has 14 windows
without a door (ungated spillway) with an overall length of 151.1 m. Abundant
capacity is 3,000 m3 / s at water surface elevation of 111.6 m.
Figure 2.1 Cutting of Morning Glory Tower and Hollow Cone Valve
2.2. CURRENT PROBLEMS
Based on results from a large inspection in 2014, hollow cone valve left
there is a leak due to stoplog is not able to close perfectly. As well as the
unbalanced of openings up to 100%. The following photos show the current
hollow cone valve and rail condition.
3. THE PROBLEM ISSUES
3.1. PROBLEM SOLVING
3.1.1. Technically
With the mechanical equipment condition of Jatiluhur dam which has
decreased function on two hollowcone and two stoplog so it needs to replace and
repair. For hollowcone valve will be total replacement while stoplog only on
rubber seal. In the implementation of hollowcone valve replacement, problems
2172
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik