beneath balanced cantilever arm and continued lowering process of old HCV
which placed on pontoon saddle.
Old HCV on the pontoon are tied with steel string sling and chain block to
avoid rocking then immediately sent to blue dock/harbor with assistance of 2 tug
boats.
Heavy equipment (capacity of crane car is 100 ton) is prepared to
disassemble/lift old HCV from pontoon and lift new HCV. Furthermore, new
HCV is delivered to morning glory.
4.2.3. Installation
New HCV removal process from pontoon and drop to baseline morning
glory, the sequence is almost same as old HCV lifting process but reversed
sequence. It starts from new HCV lifting from outside of morning glory and
lowered down using balanced cantilever.
Figure 4.15 New HCG Lifting and Lowering Process
Before new HCV installation, first doing the rail replacement and brushing
flange existing.
Figure 4.16 Replacing Process of Rail and Brushing Flange Existing
2176
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik