THE GROUTABILITY INVESTIGATION OF PUMICE PACKED BEHIND
TUNNEL LINING SYSTEM
GHASEM DERAVI
Head of site supervision of drilling and grouting department on dam and tunnel
design/inspection, MAHABGHOODS CONSULTING ENGINEERING COMPANY
ALI AKBAR VAHEDI
Project manager, designing department on main office,
MAHABGHOODS CONSULTING ENGINEERING COMPANY
AMIR HAFEZQURAN
Engineer site supervision of drilling and grouting department on dam and tunnel
inspection, MAHABGHOODS CONSULTING ENGINEERING COMPANY
IRAN
1. INTRODUCTION
Todays, construction of dam and power plant projects with the aim of
electricity generation, flood control and water storage for use in industry,
agriculture and drinking is a part of the government’s development plans, and in
Iran, these plants are being pursued. For instance, one of the project is 4 km
pressure tunnel under construction in West Azerbaijan province, northwest of
IRAN.
The construction of each tunnel always has unique technical
geological/engineering problems. On-time solution of such problems is very
effective in achieving the schedule of project planning, and it can provide the
satisfaction of the client.
2182
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik