3. GEOTECHNICAL APPROACH & HYDRAULIC DIMENSIONING
The focus of the geotechnical approach predominantly has to be lain upon
the feasibility of the excavation method and not upon the lining. Since mechanical
excavation in most cases is a preferable method to excavate headrace systems,
the focus will lay upon the feasibility of TBM excavation for the headrace tunnel of
the low-pressure section. The same is due for an inclined shaft of the high-
pressure section or for raise boring, in case of a vertical shaft.
Regarding the geotechnical approach, it has proofed to follow the guideline
for the Geotechnical Design of Underground Structures of the Austrian Society
for Geomechanics [2] and to determine the âground behavior typesâ (BT)
systematically along the longitudinal section and especially in disturbed zones. If
the ground behavior predominantly works out âstableâ (BT1) to âdisintegratedâ
(BT2) behavior types, excavation with an open Gripper TBM might be a proper
solution. If the ground behavior predominantly offers disintegrated rock, as well
as shallow and deep reaching rock-mass failure or rock burst(BT2 and above), an
open Gripper TBM especially equipped for such behavior or a shielded TBM may
be the best choice [3], [7].
For hydraulic dimensioning, the âStrickler- Formulaâ is serving properly and
with sufficient accuracy. For cast in situ concrete, the Strickler roughness
coefficient kSTR might be chosen with 80-90 [m1/3s-1]. For a segmental lining with
mortar joint fill, the Strickler roughness coefficient kSTR might be chosen with 75-
80 [m1/3s-1]. The roughness coefficient for segmental linings is considering
smooth surfaces without pockets, which may exist in bolted linings.
4. HIGH PERFORMANCE EXCAVATION AND ROCK SUPPORT
The internal diameter of pressure tunnels most frequently is ranging from 4
to 7 meters with a tendency towards bigger diameters. This range of diameters is
a range, where TBM-tunnelling in most cases is the most preferable and
economical construction method.
Fig. 4 is showing the results of a comparison of achievable net advance
rates between TBM and D&B excavation with a single heading either (1 D&B
heading) and a D&B counter heading in addition (2 D&B headings). For the TBM
heading, the net advance rate [m/wd] can be derived as follows:
đ đ đĄ đ đ
đŁ đ
đ đ đ đ đ đĄ
đ =â đ âđ â60â24
1000 đ đ đ”
đ ,24â â đ
(đ âđ ) [1]
- p⊠penetration with, p=7mm/rev
- n⊠cutter head speed [rev/min], derived with
- đ = 50 đ·
đ
đ„
đ
â [2]
- Dexc⊠Excavation diameter [m]
- ηTBM,24h⊠TBM net boring time utilization, with ηTBM,24h =35%
2219
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen UniversitÀt Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik