The “cost factor” shown in Fig. 5 comprises the relation of the construction
costs of the lining calculated for the different lining types. The costs per meter for
an unsealed concrete lined tunnel was taken as a reference value with “1”. From
Fig. 5 the benefit can be derived, to remain with an unsealed lining as far as
possible. Unlined tunnels, which would comprise the lowest construction costs
nowadays, became more and more out of fashion due to risk in terms of falling
rock into turbine water.
6. GROUTING AS A KEY TASK
The principle to gain most benefit from the surrounding rock mass in order
to achieve the most economical lining type is determined by the following tasks:
- To activate a sound rock mass load bearing ring in order to reduce the
bearing capacity required from the lining.
- To hide below the ground water table in order to reduce sealing tasks to
a minimum.
- To improve the surrounding rock mass by grouting in order to achieve
most uniform and consolidated rock mass conditions, to reduce the rock
mass permeability in order to control water communication between
inside and outside the tunnel and pre-stress the ling system in order to
improve with regard to internal pressure fluctuation.
The first task can be met by applying the construction principles of NATM.
The second can be met by a sound layout design of the headrace system [1].
The last can be met by grouting. Grouting in any case should comprise
systematically contact grouting as a basis and consolidation- and/or sealing
grouting, in terms of borehole grouting, systematically or where required [11].
7. HOW THE CIRCLE GETS CLOSED
At high head hydropower plants with gross height greater than 500m of the
conventional “Alpine type”, in most cases the headrace system comprises the
mayor part of the plant costs. At the other hand, especially this part comprises
the mayor chance to gain as much benefit from the surrounding rock mass, to
keep the overall projects costs low, and to turn a project towards economic
feasibility.
The first step starts with a layout design keeping the cost-factor of the lining
type in focus. The next step is to achieve a high performance excavation method
and economic support method comprising already a final lining, meeting the
2223
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik