Seite - 2231 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 2231 -
Text der Seite - 2231 -
and density) and on the geometry of the deformation, and using the stress-strain
curve of the selected geocomposite. The tension in the geocomposite liner thus
obtained must be at least equal to what imposed by the established Factor of
Safety (FS). The tension transmitted to the anchorage lines results in a pull-out
component and a shear component: the design condition for the calculation of the
pull-out force on the anchors corresponds to the case in which two adjacent sheets
of geocomposite liner are simultaneously damaged and uplifted, resulting in the
combination of the pull-out components (one for each sheet), while the design
condition for the calculation of the shear force on the anchor corresponds to the
case in which only a single sheet of geocomposite liner is uplifted, resulting in an
asymmetric shear component. The data obtained by calculations of the tension in
the geocomposite, of FS on the geocomposite, of pull-out and shear forces on the
anchors, and of FS for pull-out and shear, verify the soundness of the anchorage
system.
A transverse stainless-steel watertight seal is placed at the beginning and
end of the lined area to avoid water infiltrating behind the liner.
The drainage system is designed based on an analysis of the estimated
amount of water that can accumulate behind the liner, leaking through the
ground/cracked concrete lining when the tunnel/shaft is empty. The inflow is
essentially due to a) the intrinsic permeability of the outer ring/concrete lining and
b) the leakage through the concrete cracks. Given the low permeability of the
concrete, leakage through cracks can be considered as the primary source of
inflow, while other sources can usually be neglected. A continuous drainage layer
consisting of a geosynthetic having high in-plane transmissivity is often applied to
enhance efficiency of drainage transmission to the custom-designed drainage
discharge components. In case of subgrade with large
cracks/discontinuities/irregularities, additional geosynthetic layers are used to
provide support/anti-puncturing.
2.3. PAST EXPERIENCE AND PERFORMANCE DATA
To the knowledge of the authors, experience of watertight geomembranes in
high-pressure conduits dates back to the late 1970ies- early 1980ies, when Austria
saw several applications with water heads in the range of 0.2 to 0.7 MPa, where
the geomembrane was sandwiched between the outer regularization ring and the
inner concrete ring. Carpi started installing totally or partially exposed
geomembranes in pressure tunnels in 1984 (Gorghiglio pressure tunnel, Italy). The
feedback of several installations proves the effectiveness of the system and its
capability to resist high pressures and water velocity. Outstanding examples
summarized below and detailed in international literature are Thissavros [1] and
Belden [2].
2231
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik