Thissavros is a 11 meters diameter pressure tunnel in Greece. The inside
water pressure is 1.5 MPa, maximum water velocity exceeds 4 m/s. Water
infiltrating from the reservoir generates a negative uplift pressure of about 0.5 MPa.
The tunnel was originally lined with concrete, which started to crack. At first
reservoir filling, because of some changes in the location of the dam grout curtain
and of the cracks in the concrete of the tunnel, the dam galleries were flooded. It
was decided to extend upstream the concrete plug for a length of 60 m. Time
constraints and a much more attractive price suggested to split the required extra
works in two sections: one section by extending the conventional concrete plug
and its steel lining, the second section by using only an exposed geomembrane
against the fractured concrete liner. Installation of a watertight SIBELON® CNT
geocomposite, anchored with tensioning profiles and watertight sealed at
peripheries, upstream on concrete and downstream on steel, required 3 weeks and
cost was approximately 25 % of the cost of an equivalent steel liner, which would
have required more than 3 months’ time for installation. The geomembrane system
was installed in 1997. A few weeks after it had been installed and the tunnel had
started operating, the tunnel had to be emptied to execute some extra grouting
works in correspondence of the concrete plug. That situation allowed testing the
fully satisfactory behaviour of the geocomposite and of its drainage system, which
worked as designed. After grouting works were completed, the tunnel was filled
again and it will be always full of water, with no plan to dewater it again. The
geomembrane liner is working effectively since 1997.
Belden hydropower plant, built in 1958 and owned by Pacific Gas and
Electric Co. (PG&E), includes a 2941.41 m long concrete lined tunnel (Tunnel 2).
In 1970, during an outage, two large circumferential cracks and additional cracks
were identified in the lining of Tunnel 2. The cracks were repaired on several
occasions; instrumentation showed that d repairs the ground was continuously
moving and slowly accelerating. PG&E undertook studies to determine the best
method to rehabilitate the tunnel whose leakage was the main cause for the sliding
of the ground. A geomembrane liner was selected because of speed of installation,
lower cost, and potential ability to accommodate future ground movements. The
geomembrane design was challenging due to the changing shape of tunnel, the
water velocity (4.27 m/s), the hydraulic head (0.54 MPa), the groundwater pressure
(0.24 MPa), and the drainage requirements due to the high water table in the
mountain and the need to drain upstream. A complete survey of the tunnel showed
that in one section the cracks could reach width > 22 mm over the design life of
the project. Such opening, together with the pressure applied to the surface, could
induce large strains in the selected watertight SIBELON® CNT geocomposite. A
support system able to withstand the load transmitted by the water pressure on the
span created by the big cracks was designed, consisting of a support geogrid
placed on the concrete. A drainage geonet was installed on the geogrid. Both
under-layers were placed in the full area to be lined, and anchored with mechanical
anchors. The geocomposite was anchored with tensioning profiles and watertight
sealed at peripheries with a mechanical seal consisting of 80 x 8 mm batten strips
with regularising resin, gaskets and splice plates to evenly distribute compression.
Installation was made in 2008, the tunnel was immediately put back to operation
2232
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik