Seite - 2234 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 2234 -
Text der Seite - 2234 -
Fig. 1
Testing under 85.2 bar pressure for Helms. At left the tested components
(drainage discharge valve, tensioning profiles and perimeter seals) ready for
testing on wood blocks. In each test, the tank is filled with water through the
instrument port. Water and air are pushed out of the system while the tank is
pressurizing. At right, detail of the tensioning profiles and of the perimeter seal
after a test
The anchors penetrating the geocomposite are equipped with suitable outfits
and gaskets to make the penetrations watertight.
Fig. 2
Helms high-pressure tunnel. At left the solid trapezoidal tensioning profiles
and flat profile anchored at the vault. At right a view of the completed anchorage
lines
The upstream and downstream transverse perimeter seals consist of flat
profiles, section 80 x 8 mm. Seven one-way mechanical pressure relief valves,
distributed along the lined area, act as drainage discharge when the tunnel is
emptied (“Fig. 3”). Construction of the waterproofing geocomposite began in
September 2017 and was completed in October 2017, with the reservoir being
placed back into operation in early November 2017.
2234
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik