Seite - 2241 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 2241 -
Text der Seite - 2241 -
reliable prediction of the transient plant behaviour and especially the surge tank
performance in unsteady load cases – such as periodic machine starts and stops
or switching load cases – is necessary.
Modern techniques in numerical simulation methods provide the only
feasible possibility to accurately calculate the occurring mass oscillations and
pressure pulsations. Thus providing a for the optimization of the transient
behaviour. Commercial software-packages for water hammer simulations usually
do not provide numerical models for a realistic calculation of complex
components like surge tanks, hydraulic turbines or emergency closing valves in a
high head hydro power plant. But especially these components need to be
modelled correctly in order to get a significant and reliable solution [1], [2].
2. OVERVIEW OF THE INVESTIGATED POWER PLANT
The Kops I hydro power plant was set into operation in 1970 with a
maximum power output of 245 MW. The hydraulic system consists of a headrace
tunnel with a length of 4.500 m which connects the Kops lake (upper reservoir)
with the surge tank of the power plant from where the penstock feeds three
Pelton units with four nozzles for each turbine.
The throttled chamber surge tank (see Fig. 2) is constructed with an upper
and a lower chamber, which is quite common for alpine high head power plants
[3]. At the base point of the surge tank, at the connection with the headrace
tunnel, one of two throttles is located. Since there is a second vortex throttle at
the intersection of the surge tank main shaft and the upper chamber, a differential
effect is created that supports damping of the mass oscillations. The fluid flow in
the lower chamber of this surge tank design will have two different states:
open channel flow if the lower chamber is aerated
pressurized flow in case of a full lower chamber combined with a
charging or discharging procedure of the surge tank
Fig. 1. shows a general hydraulic layout of the power plant, for the main
data of the original power plant setup see Table 1.
In the course of a rehabilitation of the generator sets of the power plant,
there was an attractive possibility of a power increase of the machinery sets.
Table 1
Power Plant data of HPP Kops I
set into operation 1969-1970 maximum gross head 780 m
number of units 3 # minimum gross head 700 m
nozzels per unit 4 # maximum power 245 MW
2241
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik